We develop the power, build it, commission it and sign for it. At any scale.

AI rendering, campus at full build
Phase one under development
A 1.25 gigawatt colocation campus
Master planned across five phases of 250 megawatts each; phase one is under development.
- 1.25 GW
- At full build
- 5
- Phases
- 250 MW
- Per phase
Developed by Kilgore Energy
The campus is not named and its location is not published. The image is an AI rendering of the campus at full build, not a photograph of the site. The detail behind it is released through the data room, per opportunity, after a conversation and an NDA.
The record
The work behind it.
Four more. Three are already public; the cogeneration plant appears without its counterparty, by agreement, and is thermal generation rather than solar and storage, which the other three do not show. Every line states which entity did the work, in the words the records use.

Completed
Bartlett Lake Marina, North America's first floating micro-grid
Solar generation and battery storage on a floating platform at Bartlett Lake, Arizona, running the marina's operations off grid.
- 1st
- Floating micro-grid in North America
- 100%
- Off-grid power to the marina
Delivered by Nerd Power

Illustrative diagram, not this facility
Completed
Cogeneration plant, a Fortune 100 semiconductor manufacturer
Developed by Kilgore Energy
By agreement, neither the counterparty nor the capacity of the plant is published. The frame is a generic process diagram of a cogeneration facility, not a drawing of this one.

Under development, target 2026
Lucid Motors manufacturing facility, Casa Grande, Arizona
A large scale commercial solar installation for the electric vehicle manufacturing facility.
- 12 MW
- Planned capacity
- 2026
- Target completion
Planning and project management by Nerd Power

Under development
Hopi Utilities Corporation, Side Rock Water Project micro-grid
A remote micro-grid for the Hopi Reservation's Side Rock water supply, funded by the Department of Energy. Solar PV and battery storage will power two wells at an unelectrified well field, supplying water to 235 residential and 14 commercial customers.
- 250 kW
- Solar PV capacity
- 1.2 MWh
- Battery storage
- $4.16M
- DOE funding
- 544K kWh
- Projected annual diesel offset
Delivered by Nerd Power