Hero background

An announcement
never powered anything.

10,000+energy projects since 2015

We develop the power, build it, commission it and sign for it. At any scale.

  1. AI rendering of the colocation campus at full build, seen from the air

    AI rendering, campus at full build

    Phase one under development

    A 1.25 gigawatt colocation campus

    Master planned across five phases of 250 megawatts each; phase one is under development.

    1.25 GW
    At full build
    5
    Phases
    250 MW
    Per phase

    Developed by Kilgore Energy

    The campus is not named and its location is not published. The image is an AI rendering of the campus at full build, not a photograph of the site. The detail behind it is released through the data room, per opportunity, after a conversation and an NDA.

The record

The work behind it.

Four more. Three are already public; the cogeneration plant appears without its counterparty, by agreement, and is thermal generation rather than solar and storage, which the other three do not show. Every line states which entity did the work, in the words the records use.

  1. The floating micro-grid platform at Bartlett Lake Marina

    Completed

    Bartlett Lake Marina, North America's first floating micro-grid

    Solar generation and battery storage on a floating platform at Bartlett Lake, Arizona, running the marina's operations off grid.

    1st
    Floating micro-grid in North America
    100%
    Off-grid power to the marina

    Delivered by Nerd Power

  2. Process diagram of a medium sized cogeneration facility: gas turbine generator, heat recovery steam generator, steam turbine, condenser and cooling tower, with electrical output to a substation and thermal output to district heating or process steam

    Illustrative diagram, not this facility

    Completed

    Cogeneration plant, a Fortune 100 semiconductor manufacturer

    Developed by Kilgore Energy

    By agreement, neither the counterparty nor the capacity of the plant is published. The frame is a generic process diagram of a cogeneration facility, not a drawing of this one.

  3. The Lucid Motors manufacturing facility in Casa Grande, Arizona

    Under development, target 2026

    Lucid Motors manufacturing facility, Casa Grande, Arizona

    A large scale commercial solar installation for the electric vehicle manufacturing facility.

    12 MW
    Planned capacity
    2026
    Target completion

    Planning and project management by Nerd Power

  4. Rendering of the Side Rock Water Project micro-grid

    Under development

    Hopi Utilities Corporation, Side Rock Water Project micro-grid

    A remote micro-grid for the Hopi Reservation's Side Rock water supply, funded by the Department of Energy. Solar PV and battery storage will power two wells at an unelectrified well field, supplying water to 235 residential and 14 commercial customers.

    250 kW
    Solar PV capacity
    1.2 MWh
    Battery storage
    $4.16M
    DOE funding
    544K kWh
    Projected annual diesel offset

    Delivered by Nerd Power

Background

Evaluating one of these?

The diligence set for each project, with the entity records behind the attribution lines, is released through the data room per opportunity, after a conversation and an NDA.

Ask the development team